At home in the world
Our references for refractory linings and steam boilers
Energy, Environment, Chemistry, Metal
Come with us on a journey and find out about our previous activities in which we have been successful for our customers at home and abroad in recent years. By targeted search you may easily find the projects from which you recognize our competence for your needs.
You will receive a brief overview of the industry, countries, years and consulting services. We would be happy to provide you with further details on our completed projects upon request.


Energy

Environment

Chemistry

Metal
Year | Trade | Field | Procedure | Country | Location | Activity |
---|---|---|---|---|---|---|
2018 | Wood Industry | Refractory Construction | Grate firing | Germany | Ehningen | Assessment and determination of the cause of damage to the refractory lining |
2018 | Chemical Industry | Refractory Construction | Miscellaneous | Germany | Großenkneten | Determination of damage and expert technical advice regarding the scope of remediation due to damage, quality controls during construction within in the scope of the repair |
2018 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Schwedt | Condition assessment and quality monitoring during construction in the scope of an inspection |
2018 | Chemical Industry | Refractory Construction | Miscellaneous | Germany | Rheinberg | Preparation of a technical specification and a quality manual for the tendering of a fluidized bed plant |
2018 | Energy Production | Refractory Construction | Grate firing | Germany | Oberhausen | Creation of a detailed repair engineering, material acceptance in the manufacturer's works and quality monitoring during construction as part of the restoration |
2018 | Metal Industry | Refractory Construction | Melting furnace | Germany | Berlin | Specialist technical support in determining the causes of increased primary energy consumption |
2018 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Austria | Lenzing | Preparation of a service catalogue and a quality manual as a basis for a framework agreement with a service partner |
2018 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Neumünster | Technical engineering support during planning of inspection, quality monitoring |
2018 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Glückstadt | Inspection of the refractory lining of a fluidized bed boiler, determination of the scope of repair, quality monitoring during construction as part of the annual inspection. |
2018 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Condition assessment and quality monitoring during construction as part of the revision of three incineration plants |
2018 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | China | Changshu | Assessment of the refractory lining, recommendations on the required scope of refurbishment, quality monitoring during construction and technical expertadvice in two CFB plants |
2017 | Engineering Service | Steam boiler | Circulating fluidised bed firing | Germany | Köln | Technical support in the preparation of a preliminary study on the use of alternative fuels |
2017 | Insurance | Steam boiler | Grate firing | Sweden | Jönköping | Technical examination of final invoices in the context of boiler damage |
2017 | Energy Production | Refractory Construction | Miscellaneous | Germany | Brunsbüttel | Technical consulting with regard to the optimization possibilities within the scope of a restoration |
2017 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Inspection of the refractory lining, determination of the scope of repairs, quality monitoring during construction of the restoration and renewal measures within the scope of the annual revision |
2017 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Glückstadt | Inspection of the refractory lining of a fluidized bed boiler, determination of the scope of repair, quality monitoring during construction as part of the annual inspection |
2017 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Neumünster | Inspection of the refractory lining of a fluidized bed boiler, determination of the scope of repair, quality monitoring during construction as part of the annual inspection |
2017 | Energy Production | Refractory Construction | Grate firing | Germany | Oberhausen | Determination of the cause of damage to a biomass fired boiler, elaboration of a repair engineering, preparation of specifications for tendering, evaluation of offers, quality monitoring during construction |
2017 | Metal Industry | Refractory Construction | Melting furnace | Germany | Berlin | Expertise on the refractory ceiling lining of an aluminium melting furnace |
2017 | Metal Industry | Refractory Construction | Circulating fluidised bed firing | New Caledonia | Koniambo | Determination of causes of damage to the refractory lining of two coal-fired CFB plants, determination of scope of remediation, expert advice in the selection of suitable refractory companies, preparation of tender documents, member of an international team of experts |
2017 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Pakistan | Faisalabad | Determination of damage mechanisms after dry heating on the refractory lining in the siphon |
2017 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Sweden | Stockholm | Condition assessment of refractory lining |
2017 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | China | Changshu | Inspection of the refractory lining, recommendation on the scope of refurbishment, quality monitoring during construction |
2017 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Austria | Lenzing | Inspection of the lining as part of the inspection, determination of causes of damage |
2017 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Schwedt | Condition assessment of refractory lining |
2017 | Energy Production | Refractory Construction | Grate firing | Germany | Andernach | Quality monitoring during construction as part of the inspection |
2017 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Premnitz | Condition assessment of refractory lining |
2017 | Environment | Refractory Construction | Stationary fluidised bed | Germany | Elverlingsen | Technical support for the rehabilitation of the refractory lining of a sewage sludge incineration plant |
2017 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Oberkirch | Condition assessment of refractory lining |
2017 | Energy Production | Refractory Construction | Pulverised coal firing | Germany | Wuppertal | Condition assessment and quality monitoring during construction as part of the inspection |
2017 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Turkey | Tufanbeyli | Technical support in the planning of the refurbishment of the refractory lining of three CFB plants for lignite combustion |
2017 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Wolfsburg | Technical support in the planning of the refurbishment of the refractory lining of three CFB plants for lignite combustion |
2017 | Chemical Industry | Refractory Construction | Miscellaneous | Germany | Rheinberg | Inspection of the combustion chamber of a steam boiler and external inspection of a chimney by flying drone |
2017 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Condition assessment and quality monitoring during construction as part of the revision of three incineration plants | |
2017 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Study comparing concrete lining and plate systems | |
2017 | Energy Production | Refractory Construction | Gas firing | Germany | Hamburg | Arbitration report on cause and repair measures on the refractory lining of a hot water boiler |
2016 | Insurance | Steam boiler | Grate firing | Sweden | Jönköping | Specialist technical advice in the context of boiler damage |
2016 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Engineering for restoration measures, inspection of the refractory lining, determination of the scope of repairs, quality monitoring of the maintenance measures as part of the annual inspection |
2016 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Pakistan | Faisalabad | Examination of the detail engineering for the new lining of a refractory lining in a coal-fired CFB plant |
2016 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Turkey | Tufanbeyli | Assessment of the refractory lining on three lignite-fired CFB plants, inspection of a repair engineering |
2016 | Environment | Refractory Construction | Stationary fluidised bed | Germany | Elverlingsen | Expert opinion on damage to a sewage sludge incineration plant |
2016 | Environment | Refractory Construction | Grate firing | Germany | Bitterfeld | Analysis of damage mechanisms and recommendation of a remediation concept |
2016 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Flensburg | Development of a customer-specific quality manual, preparation of tender documents for auditing services, evaluation of tenders and award of contract recommendations, quality monitoring during construction |
2016 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Glückstadt | Development of a customer-specific quality manual, preparation of tender documents for auditing services, evaluation of tenders and award of contract recommendations, quality monitoring during construction |
2016 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Basic determination and tendering of refurbishment measures for the refractory lining of the combustion chamber of an RDF-fired incineration plant within the scope of a retrofit |
2016 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Creation of a quality manual for refractory linings as part of a request specification |
2016 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Inspection of the refractory lining during a planned combustion plant shutdown at two RDF-fired incineration plants, initial evaluation of a new lining process in a flue gas hood |
2016 | Energy Production | Steam boiler | Pulverised coal firing | Germany | Wuppertal | Expert opinion within the scope of a preservation of evidence procedure including technical evaluation of material analyses |
2015 | Insurance | Steam boiler | Pressure charged fluidised bed | Germany | Cottbus | Expert opinion on the determination of the causes of a smouldering fire in a lignite-fired pressure-charged fluidized bed plant |
2015 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Pakistan | Faisalabad | Preparation of tender documents and tender evaluation, quality monitoring during the planning phase for a coal-fired CFB plant |
2015 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Finland | Leppävirta | Quality control during the acceptance of shaped refractory bricks in the manufacturer's works for a CFB plant |
2015 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Sweden | Stockholm | Quality monitoring during the construction of the new refractory lining of a completely tubed CFB plant |
2015 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | China | Changshu | Detail engineering and technical consulting for the installation of a "French balcony" to reduce pipe wall erosion in the combustion chamber of a coal-fired fluidized bed boiler |
2015 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Detailed engineering for the complete restoration of two siphons and the partial renovation of a cyclone, inspection of the refractory lining, determination of the scope of repairs, quality monitoring during construction of the maintenance measures as part of the annual overhaul |
2015 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Turkey | Tufanbeyli | Inspection and damage analysis on the refractory lining of a lignite-fired CFB plant |
2015 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Statement on the legal opinion in the event of damage to the refractory lining in a flue gas hood of an RDF-fired incineration plant |
2015 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Expertise on the refractory lining in three RDF-fired incineration plants, quality monitoring during construction as part of the refurbishment work |
2015 | Metal Industry | Refractory Construction | Circulating fluidised bed firing | New Caledonia | Koniambo | Determination of causes of damage to the refractory lining of two coal-fired CFB plants, determination of scope of remediation, expert advice in the selection of suitable refractory companies, preparation of tender documents, member of an international team of experts |
2015 | Environment | Refractory Construction | Grate firing | Germany | Bitterfeld | Plant inspection as a basis for damage analysis on a waste-fired grate furnace |
2015 | Chemical Industry | Refractory Construction | Miscellaneous | Germany | Brunsbüttel | Advice on refractory damage to a pendulum furnace as part of a warranty |
2015 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Flensburg | Preparation of an engineering for the rehabilitation of nozzles for the supply of substitute fuel, quality monitoring during construction during the inspection of a CFB plant |
2015 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Neumünster | Preparation of an assembly engineering for the restoration of a siphon, preparation of a material specification, preparation of a bill of quantities for revision processing, evaluation of offers and participation in technical and commercial contract award discussions, quality monitoring during construction as part of the annual revision |
2015 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Glückstadt | Preparation of a strategy paper for the revision planning, inspection of the refractory lining, quality monitoring during construction as part of the annual inspection |
2015 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Assessment of the refractory lining in three RDF-fired incineration plants, quality monitoring during construction as part of the restoration work |
2015 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Technical support in matter of failure of the refractory lining of a flue gas hood of an RDF-fired combustion plant |
2015 | Engineering Service | Refractory Construction | Grate firing | Germany | Straubing | Expert opinion on damage to the refractory lining in the combustion chamber of a sewage sludge incineration plant |
2015 | Energy Production | Refractory Construction | Pulverised coal firing | Germany | Wuppertal | Inspection of the refractory lining at a CFB plant |
2015 | Energy Production | Refractory Construction | Pulverised coal firing | Germany | Wuppertal | Inspection of the refractory lining and quality monitoring during construction of the refurbishment measures of the ceiling lining and burner muffle in a lignite dust fired combustion plant |
2015 | Energy Production | Steam boiler | Pulverised coal firing | Germany | Wuppertal | Support of technical investigations for the optimization of a pulverized lignite burner |
2014 | Insurance | Steam boiler | Grate firing | Germany | Dahlenburg | Expert opinion on the cause of damage to a grate firing system and its effects on other components |
2014 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Development of a repair engineering for cyclone and siphon, inspection of the refractory lining, determination of the repair scope, quality monitoring of the maintenance measures during construction as part of the annual inspection |
2014 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | China | Changshu | Detail engineering and technical consulting for the installation of a "French balcony" to reduce tube wall erosion in the combustion chamber of a coal-fired fluidized bed boiler |
2014 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Sweden | Stockholm | Examination of the engineering for the relining of the refractory lining of a completely tubed CFB plant |
2014 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Finland | Leppävirta | Prequalification of a Finnish refractory company within the scope of a request for the lining of an RDF-fired CFB plant |
2014 | Insurance | Refractory Construction | Rotary kiln | Germany | Rüdersdorf | Expert opinion on the damage to the refractory lining in a rotary kiln |
2014 | Insurance | Steam boiler | Circulating fluidised bed firing | Germany | Osnabrück | Expert opinion on the causes of various pipe damage to a CFS plant |
2014 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Assessment of the refractory lining in three RDF-fired incineration plants, quality monitoring during construction as part of the restoration work |
2014 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Assessment of the refractory lining and quality monitoring during the renovation of the lining of flue gas hoods at three RDF-fired combustion plants |
2014 | Paper Industry | Refractory Construction | Grate firing | Libanon | Halat | Engineering for the rehabilitation of the refractory lining of a biomass fired grate furnace |
2014 | Paper Industry | Refractory Construction | Stationary fluidised bed | Bulgaria | Stambolijski | Inspection and preparation of a technical report on the refractory lining of a biomass fired incineration plant |
2014 | Environment | Refractory Construction | Grate firing | Germany | Stavenhagen | Inspection of the refractory lining as well as repair and maintenance recommendations within the scope of the revision |
2014 | Refractory Construction | Refractory Construction | Miscellaneous | Germany | Klötze | Analysis and evaluation of internal organizational processes for dry heating of refractory lining systems within a refractory construction company |
2014 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Duisburg | Preparation of an inspection plan with a specification of Services, quantities, enquiry and bid evaluation with contract award recommendation, participation in technical and commercial contract award discussions, development of an engineering for the restoration of the fluidized bed cooler of a cfb boiler |
2014 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Flensburg | Advice on strategic revision planning in the field of refractories for two fluidized bed boilers |
2014 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Neumünster | Examination of the engineering for the remediation of parts of the fluidized bed plant, quality monitoring during construction during the inspection |
2014 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Glückstadt | Preparation of a customer-specific quality manual for refractory linings, quality monitoring during construction and determination of the scope of repairs within the scope of the annual inspection |
2014 | Energy Production | Refractory Construction | Grate firing | Austria | Wien | Quality monitoring of the refractory lining during the project for the construction of two grate firing plants for waste incineration |
2014 | Energy Production | Refractory Construction | Pulverised coal firing | Germany | Wuppertal | Inspection of the refractory lining on the boiler roof and burner muffle of a lignite dust fired steam boiler |
2014 | Energy Production | Steam boiler | Pulverised coal firing | Germany | Wuppertal | Technical consulting for the optimization of an ash removal system on a pulverized lignite fired steam boiler |
2014 | Insurance | Steam boiler | Pulverised coal firing | Germany | Boxberg | Investigation of damage to a flue gas heat displacement system |
2013 | Paper Industry | Refractory Construction | Pulverised coal firing | Bulgaria | Galabovo | Inspection of the refractory lining at the suction shafts of a lignite-fired steam boiler |
2013 | Power Plant Construction | Refractory Construction | Stationary fluidised bed | Bulgaria | Stambolijski | Inspection of the refractory lining as well as repair and maintenance recommendations within the scope of the revision |
2013 | Power Plant Construction | Refractory Construction | Grate firing | Libanon | Halat | Expert advice on damage to the refractory lining of a grate firing boiler |
2013 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Inspection of the refractory lining, determination of the scope of repair, quality monitoring during construction as part of the annual inspection |
2013 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Witzenhausen | Assessment of the refractory lining of an RDF-fired CFB plant |
2013 | Energy Production | Refractory Construction | Circo-Fluid | Germany | Saarbrücken | Preparation of an expertise on the condition of the refractory lining of a circo-fluid combustion system |
2013 | Insurance | Steam boiler | Circulating fluidised bed firing | Germany | Eisenhüttenstadt | Expert reports to determine the interrelationships of various damages in an RDF-fired CFB plant |
2013 | Refractory Construction | Refractory Construction | Miscellaneous | Germany | Schwetzingen | Optimization of internal work processes for dry heating of refractory linings |
2013 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Kassel | Quality monitoring during the planning and implementation of the 3rd stage of refurbishment of the refractory lining in a biomass fired fluidized bed boiler |
2013 | Engineering Service | Refractory Construction | Oil firing | Poland | Jaworzno | Inspection of the refractory lining in an oil-fired steam generator |
2013 | Environment | Refractory Construction | Grate firing | Germany | Tübingen | Inspection of the refractory lining in a grate boiler |
2013 | Environment | Refractory Construction | Grate firing | Germany | Stavenhagen | Inspection of the refractory lining in a grate boiler |
2013 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Neumünster | Expert advice for the preparation of maintenance measures, quality monitoring during construction |
2013 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Glückstadt | Inspection of the refractory lining of a fluidized bed boiler, determination of the repair scope, quality monitoring during construction as part of the annual inspection |
2013 | Energy Production | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Evaluation of offers for the refurbishment of the refractory lining in a flue gas hood, technical inspection of an engineering, quality monitoring during the project |
2013 | Energy Production | Refractory Construction | Grate firing | Austria | Wien | Quality monitoring during the project for the construction of two grate firing plants for waste incineration |
2013 | Energy Production | Refractory Construction | Pulverised coal firing | Germany | Wuppertal | Quality monitoring during the project for the lining of a burner muffle on a lignite dust fired steam boiler |
2013 | Insurance | Steam boiler | Circulating fluidised bed firing | Austria | Lenzing | Expert opinion on the cause of damage to superheater pipes in an RDF-fired fluidized bed plant |
2012 | Power Plant Construction | Steam boiler | Miscellaneous | South Korea | Tao Yuan | Evaluation of changes in the original engineering of the refractory lining of a waste fired fluidized bed plant |
2012 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Inspection of the refractory lining, determination of the scope of repair, quality monitoring during construction as part of the annual inspection |
2012 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Turkey | Eskişehir | Quality monitoring during the planning phase for a coal-fired CFB plant |
2012 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Witzenhausen | Assessment of the refractory lining of a fluidized bed boiler |
2012 | Power Plant Construction | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Assessment of the refractory lining of a waste-fired fluidized bed plant within the scope of the removal of damage |
2012 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Kassel | Quality monitoring during the planning and implementation of the 2nd stage of refurbishment of the refractory lining in a biomass fired fluidized bed boiler |
2012 | Environment | Refractory Construction | Grate firing | Germany | Stavenhagen | Inspection of the refractory lining, repair and maintenance recommendations as part of the revision |
2012 | Energy Production | Steam boiler | Circulating fluidised bed firing | Germany | Papenburg | Advice on minimizing consequential damage in the event of partial pressure damage to a fluidized bed system |
2012 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Köln | Inspection of the refractory lining of a fluidized bed boiler, determination of the scope of repair, quality monitoring during construction as part of the annual overhaul |
2012 | Refractory Construction | Refractory Construction | Miscellaneous | Germany | Darmstadt | Assessment of the damage analysis of an expert on the damage to the refractory lining of a pilot plant for CO2 separation |
2012 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Duisburg | Project management, quality monitoring during the refurbishment of the refractory lining in a fluidized bed boiler |
2012 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Neumünster | Optimization of internal processes for planning and preparation of maintenance work on the refractory lining of a fluidized bed plant |
2012 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Neumünster | Inspection of the refractory lining, determination of the scope of repair, quality monitoring as part of the annual inspection of an RDF-fired fluidized bed boiler |
2012 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Glückstadt | Inspection of the refractory lining, determination of the scope of repairs, quality control as part of the annual inspection |
2012 | Environment | Refractory Construction | Stationary fluidised bed | Germany | Hamburg | Inspection of the refractory lining of a stationary fluidized bed furnace |
2012 | Engineering Service | Refractory Construction | Circulating fluidised bed firing | Australia | Worsley | Quality monitoring during construction for the new installation of two coal-fired fluidized bed plants |
2011 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Australia | Worsley | Quality monitoring during construction for the new installation of two coal-fired fluidized bed plants |
2011 | Power Plant Construction | Refractory Construction | Stationary fluidised bed | Hong Kong | Hong Kong | Preparation of tender documents, tender evaluation, quality monitoring of the engineering for the new installation of a sewage sludge fired stationary fluidized bed plant |
2011 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Karlsruhe | Assessment of damage to the refractory lining and recommendation for maintenance work on a coal and biomass fired fluidized bed boiler |
2011 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Eisenhüttenstadt | Inspection of the refractory lining as part of the inspection, recommendations for the scope of maintenance of an RDF-fired fluidized bed plant |
2011 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Glückstadt | Inspection of the refractory lining as part of the revision, recommendations for the scope of maintenance of a fluidized bed plant |
2011 | Insurance | Steam boiler | Grate firing | Germany | Stuttgart | Expert opinion on the causes of damage to superheater packages in a waste wood-fired grate boiler |
2011 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Osnabrück | Preparation of a repair concept, preparation of tender documents, evaluation of offers and quality monitoring of engineering during the refurbishment of an RDF-fired fluidized bed plant |
2011 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Turkey | Eskişehir | Preparation of tender documents and tender evaluation, quality monitoring during planning for a coal-fired CFB boiler |
2011 | Energy Production | Refractory Construction | Grate firing | Germany | Frankfurt/Main | Inspection of the refractory lining on a biomass fired grate boiler, recommendations for the scope of inspection |
2011 | Wood Industry | Refractory Construction | Grate firing | Austria | Aschbach | Assessment of the refractory lining of a biomass fired grate boiler |
2011 | Power Plant Construction | Refractory Construction | Stationary fluidised bed | Germany | Frankfurt/Main | Assessment of the refractory lining of a waste-fired stationary fluidized bed plant within the scope of the removal of damage |
2011 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Pforzheim | Inspection of the refractory lining as part of the revision, preparation of a technical procurement specification as a basis for inquiries for maintenance work |
2011 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Kassel | Quality monitoring during the planning and implementation of the first stage of refurbishment of the refractory lining in a biomass fired fluidized bed boiler |
2011 | Paper Industry | Refractory Construction | Stationary fluidised bed | Bulgaria | Stambolijski | Inspection of a biomass fired stationary fluidized bed furnace after various boiler damages, consultation for repair and investigation of possible causes |
2011 | Environment | Refractory Construction | Grate firing | Germany | Stavenhagen | Inspection of the refractory lining and repair and maintenance recommendations as part of the inspection with quality monitoring during construction, preparation of a quality manual and a framework contract for commissioning maintenance services |
2011 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Duisburg | Concept development, preparation of tender documents, evaluation of tenders |
2011 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Neumünster | Assessment of damage to the refractory lining of an RDF-fired fluidized bed boiler |
2011 | Power Plant Construction | Steam boiler | Circulating fluidised bed firing | Germany | Wolfsburg | Advice on the preparation of a concept for feeding in a fluidized bed boiler in the scope of malfunctions |
2011 | Engineering Service | Refractory Construction | Circulating fluidised bed firing | Australia | Worsley | Quality monitoring during construction for the new installation of two coal-fired fluidized bed plants |
2010 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Inspection of the refractory lining in a CFB boiler as part of the inspection |
2010 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Phillippines | Cebu | Assessment of the refractory lining of a circulating fluidised bed within the scope of a warranty claim |
2010 | Engineering Service | Steam boiler | Miscellaneous | Germany | Plattling | Expert opinion on the execution of internal insulation in an exhaust gas duct between gas turbine and waste heat boiler |
2010 | Energy Production | Refractory Construction | Grate firing | Germany | Fechenheim | Inspection of the refractory lining in a grate boiler for biomass combustion |
2010 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Pforzheim | Concept development and preparation of tender documents for the refurbishment of the refractory lining in a fluidized bed boiler |
2010 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Pforzheim | Expertise on the refractory lining of a fluidized bed boiler |
2010 | Energy Production | Refractory Construction | Grate firing | Germany | Kassel | Expertise on the refractory lining within the scope of a warranty claim |
2010 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Concept development on the strategy for the maintenance of the refractory lining in a fluidized bed boiler |
2010 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Assessment and preparation of a repair concept in the context of damage to the lining in a fluidized bed boiler |
2010 | Environment | Refractory Construction | Grate firing | Germany | Stavenhagen | Quality monitoring as part of the refurbishment of the refractory lining in an RDF-fired grate boiler |
2010 | Power Plant Construction | Steam boiler | Circulating fluidised bed firing | Germany | Oberursel | Advice within the scope of the preliminary planning for the construction of a fluidized bed plant |
2010 | Energy Production | Steam boiler | Circulating fluidised bed firing | Germany | Wolfsburg | Advice on pressure part damage to fluidized bed coolers |
2009 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Begutachtung der feuerfesten Auskleidung einer ZWSF-Anlage im Rahmen der Revision |
2009 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Eisenhüttenstadt | Advice on tendering and engineering, installation supervision for a CFB plant |
2009 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Australia | Worsley | Advice on tendering and engineering, installation supervision for a CFB plant |
2009 | Insurance | Steam boiler | Grate firing | Germany | Liebenscheid | Expert opinion on the causes of damage to superheater packages in a waste wood-fired grate boiler |
2009 | Engineering Service | Steam boiler | Circulating fluidised bed firing | Czech Republic | Okres Tábor | Support in optimizing the operation of a fluidized bed plant |
2009 | Energy Production | Steam boiler | Grate firing | Germany | Pforzheim | Comparative evaluation of coatings on grate boilers for waste incineration |
2009 | Environment | Refractory Construction | Grate firing | Germany | Stavenhagen | Assessment of the refractory lining in an RDF-fired grate boiler |
2009 | Food Industry | Steam boiler | Miscellaneous | Germany | Nordstemmen | Expert procedeedings for Determination of cause of damage to the external insulation of a drum dryer |
2009 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Düsseldorf | Planning the refractory lining for four piped fluidized bed heat exchangers in a CFB plant in Botswana |
2008 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Bischofferode | Assessment of the refractory lining in a CFB plant |
2008 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Glückstadt | Advice on tendering and engineering, installation supervision in a CFB plant |
2008 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Schwedt | Advice on tendering and engineering, installation supervision in a CFB plant |
2008 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Karlsruhe | Advice on tendering and engineering, installation supervision in a CFB plant |
2008 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | USA | Reading | Advice on tendering, installation supervision in a CFB plant |
2008 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Osnabrück | Expert opinion on damage to the refractory lining of a fluidized bed boiler |
2008 | Paper Industry | Refractory Construction | Circulating fluidised bed firing | Germany | Osnabrück | Expertise on the refractory lining of a fluidized bed boiler |
2008 | Environment | Steam boiler | Miscellaneous | Germany | Harrislee | Project study for the energetic utilization of waste wood |
2008 | Energy Production | Refractory Construction | Grate firing | Germany | Pforzheim | Assessment of the condition of the refractory lining in a biomass fired grate boiler |
2008 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Pforzheim | Assessment of the condition of the refractory lining in a fluidized bed boiler |
2008 | Industrial Service | Steam boiler | Miscellaneous | Germany | Bremen | Preparation of tender documents |
2008 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Emlichheim | Assessment of the refractory lining in a biomass fired fluidized bed boiler |
2007 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Wittenberg | Advice on tendering and engineering, installation supervision in a CFB plant |
2007 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Bischofferode | Expertise on the refractory lining in a CFB plant |
2007 | Insurance | Steam boiler | Miscellaneous | Germany | Meppen | Expert opinion on the extent and liability of fire damage in the boiler house of a wood-processing company |
2007 | Insurance | Steam boiler | Circulating fluidised bed firing | Germany | Wolfsburg | Expert opinion on the extent and liability of fire damage in the boiler house of a wood-processing company |
2007 | Other industries | Refractory Construction | FiCirc fluidised bed | Australia | Warkworth | Expert in a dispute over the failure of the refractory lining in a fluidized bed plant |
2006 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Witzenhausen | Advice on tendering and engineering, installation supervision in a CFB plant |
2006 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Bischofferode | Assessment of the refractory lining of a fluidized bed boiler |
2006 | Industrial Service | Steam boiler | Circulating fluidised bed firing | Germany | Wolfsburg | Advice on the preparation of an operating manual for CFB plants |
2005 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Brazil | Telêmaco Borba | Advice on tendering and engineering, installation supervision in a CFB plant |
2005 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Poland | ŚwiecieŚwiecieŚwiecie | Expertise on the refractory lining of a fluidized bed boiler |
2005 | Metal Industry | Steam boiler | Miscellaneous | Brazil | Rio de Janeiro | Advice on the awarding of a CFB plant |
2005 | Power Plant Construction | Steam boiler | Stationary fluidised bed | Germany | Brilon | Consulting for process engineering conversion of a fluidized bed plant |
2004 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Poland | ŚwiecieŚwiecieŚwiecie | Assessment of the refractory lining of a fluidized bed boiler |
2004 | Metal Industry | Refractory Construction | FiCirc fluidised bed | Brazil | Barcarena | Quality control in engineering and assembly |
2004 | Metal Industry | Steam boiler | Circulating fluidised bed firing | Brazil | Barcarena | Consulting for the definition of a firing system for a new power plant with hard coal firing |
2004 | Refractory Construction | Refractory Construction | Rotary fluidised bed | Austria | Wien | Condition assessment of the refractory lining in a rotating fluidized bed |
2003 | Power Plant Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Neumünster | Advice on tendering and engineering, installation supervision in a CFB plant |
2002 | Metal Industry | Steam boiler | Circulating fluidised bed firing | Turkey | Gebze | Determination of the thermal loss of a fluidized bed plant |
2002 | Industrial Service | Steam boiler | Miscellaneous | Germany | Düsseldorf | Studies on operational requirements for power plant components |
2001 | Other industries | Steam boiler | Miscellaneous | Latvia | Riga | Development of an energy concept within the framework of the EU accession negotiations |
2000 | Industrial Service | Steam boiler | Circulating fluidised bed firing | Austria | Lenzing | Review of the design principles for the replacement of a superheater in the fluidized bed cooler |
2000 | Environment | Refractory Construction | Circulating fluidised bed firing | Austria | Lenzing | Assessment of the condition of a CFB plant, restoration concept within the scope of the warranty |
1999 | Industrial Service | Steam boiler | Circulating fluidised bed firing | Germany | Berlin | Examination of the support concept of a tube bundle in a CFB plant |
1999 | Industrial Service | Steam boiler | Circulating fluidised bed firing | Germany | Berlin | Consulting on the design and tendering of a shot cleaning system in a CFB plant |
1998 | Industrial Service | Steam boiler | Circulating fluidised bed firing | Germany | Wolfsburg | Analyses to optimize the fuel feed in a CFB plant |
1998 | Industrial Service | Steam boiler | Miscellaneous | Germany | Düsseldorf | Advice on conversions and extensions to the water-steam cycle of natural circulation boilers |
1998 | Industrial Service | Steam boiler | Miscellaneous | Germany | Düsseldorf | Advice on drafting contracts for cooperation with a cooperation partner |
1997 | Industrial Service | Steam boiler | Circulating fluidised bed firing | Germany | Düsseldorf | Advice on the design of heating surfaces in fluidised bed heat exchangers |
1996 | Refractory Construction | Refractory Construction | Miscellaneous | Germany | Schwetzingen | Advice on requirements for refractory linings in fluidized bed plants |
1996 | Chemical Industry | Steam boiler | Circulating fluidised bed firing | Germany | Duisburg | Assessment of the outsourcing of energy operations, optimisation of the operation of a circulating fluidised bed combustion system |
1995 | Metal Industry | Refractory Construction | Circulating fluidised bed firing | Czech Republic | TřinecTřinec | Assessment of the refractory lining |
1995 | Engineering Service | Steam boiler | Circulating fluidised bed firing | Germany | Neu Wulmstorf | Preparation of operating manuals for CFB systems |
1995 | Industrial Service | Refractory Construction | Miscellaneous | Germany | Vettelschoß | Advice on wear protection for thermal processing plants in areas of highly loaded ash flows |
1995 | Industrial Service | Steam boiler | Pulverised coal firing | Poland | Inovroclav | Advice on the conversion of four dust firing systems to low NOx burners |
1994 | Energy Production | Refractory Construction | Circulating fluidised bed firing | France | Carling | Condition assessment and restoraton concept for the refractory lining of a CFB plant |
1994 | Industrial Service | Steam boiler | Miscellaneous | Germany | Salzgitter | Consulting on the application of thermal coatings in power plants |
1993 | Energy Production | Refractory Construction | Circo-Fluid | Germany | Offenbach | Assessment of the refractory lining |
1993 | Refractory Construction | Refractory Construction | Miscellaneous | Germany | Schwetzingen | Process engineering consulting for the design and operation of power plants |
1992 | Power Plant Construction | Steam boiler | Circulating fluidised bed firing | Finland | Helsinki | Optimization of the design with a view to more economical plant operation of fluidized bed combustion plants |
1992 | Refractory Construction | Refractory Construction | Circulating fluidised bed firing | Germany | Wählitz | Project planning and creating a specification |
1992 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Germany | Berrenrath | Consulting within the scope of remediation measures of a lignite-fired CFB plant |
1992 | Energy Production | Steam boiler | Circulating fluidised bed firing | Finland | Seinäjoki | Optimisation of the operation of a fluidised bed plant |
1991 | Energy Production | Refractory Construction | Circulating fluidised bed firing | Finland | Seinäjoki | Condition assessment and elaboration of a restoration concept |